The Septic Install
![]() |
| Maggie heading to the septic field to dig in the 4 lines - before she broke a hydraulic hose |
![]() |
| Maggie heading down the electric easement to the septic field |
![]() |
| digging the hole in the middle of the circular driveway for the septic tank |
![]() |
| rocks pulled out of the hole for the septic tank |
![]() |
| Septic tank is set into the hole |
![]() |
| looking down the electric line easement - septic field off to the left |
![]() |
| This front yard is going to be one muddy mess in the Spring |
![]() |
| the trees being removed for the septic field |
![]() |
| The rocks pulled out of the line field |
![]() |
| and more rocks |
![]() |
| Jack always checking out the progress |
![]() |
| the trees with red x's still to be removed, making progress |
![]() |
| large rocks weren't the only challenge - big root balls were just as troublesome |
![]() |
| unfortunately, we had to remove a lot of trees to make room for the septic lines |
![]() |
| this view shows the angle of the electric easement a little better |
![]() |
| For some reason this angle makes the electric easement appear flat. It is NOT flat there it's actually rather steep. |
![]() |
| the tank is set |
![]() |
| lines crossing the circular driveway from the tank toward the septic field |
![]() |
| backfilling the east side of the circular driveway septic line |
![]() |
| digging in the septic line on the west side of the circular drive to connect the lines at the hosue |
![]() |
| moving more rocks out of the way |
![]() |
| the septic line running up to the house |
![]() |
| adding a water hydrant along the driveway |
![]() |
| getting ready to backfill the west side of the driveway |
![]() |
| installing some cleanouts |
![]() |
| digging in the water line from the well house to the main house |